

SINGLE CARRIAGE/DOUBLE CARRIAGE.ġ5 REEVE LINE ENGLISH REEVE / NORWEGIAN REEVE.ġ8 HIGHLINE LOADS ONE-PERSON LOAD TWO- PERSON LOAD LITTER LOADS- SPIDERS WITH HIGHER LOADS TANDEM PULLEYS CREATE LESS OF A BEND IN THE ROPE. BECAUSE OF THE SAG THE LOWERING LINE WILL ACT MORE IN ITS FUNCTION OF A BELAY.ġ3 TAG LINE RUNS FROM THE FAR-SIDE POINT AND IS CONNECTED TO THE LOAD.ġ4 PULLEYS TRAVELS ALONG THE MAIN LINE ROPE. TO CONTROL THE SPEED OF THE LOAD THROUGH THE LOWERING DEVICE. SHOULD BE OF A LOW-STRETCH DESIGN, SUCH AS STATIC KERNMANTLE.ġ2 LOWERING/BELAY LINE RUNS FROM THE NEAR-SIDE POINT AND IS CONNECTED TO THE LOAD, IT SERVES 2 PERPOSES. LINE THAT SUPPORTS THE MAJOR OF THE WEIGHT OF THE LOAD. IN STEEP ANGLE THE UPPER ANCHOR WILL BE THE ONE MOST SUBJECTED TO STRESS.ġ0 FAR-SIDE ANCHOR THE ANCHOR TO WHICH MAIN LINE ROPEIS ATTACHED ONCE ROPE HAS GOTTEN ACROSS TO THE FAR-SIDE POINT. IN HORIZONTAL HIGHLINE BOTH MAIN LINE ANCHORS WILL BE SUBJECTED TO SIMILAR STRESSES. MAIN LINE / TRACK LINE LOWERING / BELAYS LINE TAG LINE PULLEYS ( carriage ) REEVE LINE ( ENGLISH/NORWEGIAN ) LOADĩ NEAR- SIDE ANCHOR THE ANCHOR TO WHICH THE MAIN LINE IS INITIALLY ANCHORED. EVACUATE PERSONS FROM A HAZARD IN WHICH THEREIS THREAT OF INJURY OR DEATH, AND WHERE THERE IS NO OTHER PRACTICAL MEANS OF EVACUATION WOULD BE A FIRE IN A BUILDING.Ĩ ELEMENTS OF A HIGHLINE NEAR-SIDE ANCHOR FAR-SIDE ANCHOR TO AVOID DIFFICULT TERRAIN MIGHT BE SUSPENDED OVER AN AREA THAT CONTAINED LARGE BOULDERS OR THICK DEBRIS, WOULD BE DIFFCULT TO MOVE A LITTER. TO AVOID HAZARDOUS TERRAIN WOULD BE USED TO BRIDGE A SWIFTLY. TO BYPASS AN OBSTACLE USED TO CROSS A DEEP CANYON ORGORGE. INVOKE THE USE OF ADVANCED RIGGINGS SKILLS ARE ALMOST ALWAYS A LAST RESORT OPTIONģ HIGHLINES IN RESCUE IN ALL CASES, THIS TERMS REFER TO A ROPE LINE SUSPENDED FROM ONE POINT TO ANOTHER BETWEEN WHICH PEOPLE, RESCUE SUBJECTS, OR EQUIPMENT CAN BE MOVEDĤ HORIZONTEL HIGHLINES SUSPENDED FRON TWO POINTS THAT ARE CLOSE TO THE SAME LEVELĥ STEEP ANGLE HIGHLINES SUSPENDED BETWEEN TWO POINTS IN WHICH ONE IS AT A MUCH HIGHER LEVEL THAN THE OTHER.Ħ USES OF HIGHLINES USED TO TRANSPORT RESCUERS, RESCUE OBJECTS, AND/OR EQUIOMENT ACROSS AN AREA THAT IS A BERRIER TO TESCUES.ħ 1. 1 HIGHLINE ALSO KNOWN AS TELPHER / TYROLEANĪ rope or rope pulled tight across a chasmor river to facilities the passage or removals patient or equipment back and forth or in one direction.Ģ HIGHLINE ONE OF THE MOST DANGEROUS AND MOST DIFFICULT VERTICAL RESCUE
